6f6d7d92



13:12. Removal and installation of assembly of the back bridge

Removal

At the corresponding complete set prepare new sealing couplings of nipple sockets of hydraulic tubes.


 PERFORMANCE ORDER

1. Dump pressure in hydraulic system (see the Head Uniform hydraulic system).
2. Prop up antiretractable boots forward wheels, firmly cock the parking brake, then a back of the car and establish to a poddomkratta it on props. Remove back wheels.
3. Remove a spare wheel with an arm of its fastening under the car.

4. Turn out fixing bolts and remove a connecting bar from assembly of the back bridge.

5. Remove back and intermediate sections of system of production of the fulfilled gases (see Systems of decrease in toxicity and production of the fulfilled gases).
6. Weaken a coupling bolt and disconnect an executive rod of manual adjustment of a road gleam from assembly of the hydraulic proofreader.
7. On the models equipped with a hydroactive suspension bracket disconnect the sensor of movements of a body.
8. On models with ABS disconnect an electrical wiring from wheel sensors.
9. Disconnect tubes of giving and return of liquid from assembly of the hydraulic regulator installed in the central part of the back bridge. Prepare for collecting the spilled liquid, at once a zakuporta the open ends of lines and unions of their connection for the purpose of minimization of losses of hydraulic liquid and in order to avoid hit in system of dirt.

10. Examine assembly of the bridge and release all hydraulic and electric lines of communication preventing further dismantle of the bridge from intermediate clamps. Some of lines should be disconnected. Try to remember routes of laying of all wires, tubes and hoses. The open ends of lines at once to a zakuporta in order to avoid hit in system of dirt.

11. Disconnect tubes of fuel pipes from the fuel tank and release them from intermediate clamps on the car bottom.
12. Prop up assembly of the back bridge a jack through wooden whetstone. Track that the emphasis fell on the bearing side beams.

13. Turn out four bolts of fastening of assembly of the back bridge.
Above — the Forward bolt of fastening of assembly of the back bridge
Below — the Back bolt of fastening of assembly of the back bridge



14. Slightly omit assembly on a jack.
15. Last time make sure, no communication tenches remained connected.
16. Slightly give assembly of the bridge for the purpose of an obvedeniye of a jellied mouth of the fuel tank back.
17. Omit assembly of the bridge on a jack and take it from under the car.

Installation

Installation is made upside-down. Pay attention to the next moments:
   a) Track correctness of laying and reliability of fastening of all lines of communication;
   b) At the corresponding complete set replace sealing elements of nipple sockets of hydraulic tubes;
   c) Tighten all fixture with the required effort;
   d) Tighten spuskny the gate of the regulator of pressure and transfer a control lever a suspension bracket to situation "Maximum";
   e) In conclusion pump over the brake system (address the Head the Brake system).