6f6d7d92



5.7. Removal and installation of a casing of the thermostat / fuel filter (diesel models)

Removal

New sealing laying will be required.


 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.
2. Empty the cooling system (address the Head Routine maintenance).
3. Remove the fuel filter (address the Head Routine maintenance).

Cover with polyethylene a dome of transmission and a starter in order to avoid hit on them the spilled fuel.

4. Disconnect an electrical wiring from the sensors of the cooling system screwed from above in a thermostat casing.
5. Disconnect hoses of a cooling path from a plastic casing of the thermostat.
6. Disconnect a hose of a cooling path from a branch pipe on the back party of a casing.

7. Turn out a bolt of fastening of a plastic casing of the fuel filter to the main casing of the thermostat.

8. Take a plastic casing and remove a sealing ring from its basis.



9. Turn out three fixing bolts and remove the main casing from a head of cylinders. Remove sealing laying.

10. Disconnect a hose from the basis of a casing and take the last from a motive compartment.

Installation

Installation is made upside-down. Pay attention to the next moments:
   a) Check a condition of the sealing ring established on the basis of a plastic casing, in case of need make replacement;
   b) Do not forget to change laying at installation of the main casing;
   c) Track correctness of laying and reliability of fastening of all hoses;
   d) You make gas station of the cooling system according to the instructions provided in the Head Routine maintenance;
   e) In conclusion do not forget to fill a power supply system (see the Head of the Power supply system and release).